Lots of fiddly work going on since the last post. All of the ladder sections have been fitted in place and painted. Each section slides sufficiently that the ladder can be extended. The only problem is that when it is extended to full height it would be about 4 feet long! Sufficient to say that I won't display it that way. I am afraid portions of it might break, being plastic construction. The platform is essentially done and can rotate slightly to stay level when the ladder is raised. Work is on-going on the waterway. The last two sections are still needed and I ran out of aluminum tubing of the right size to complete it! Trip to the LHS should solve that problem. Here's where we are at as of now.
Hosted on Fotki
Hosted on Fotki
Hosted on Fotki